JJM FARMS SOLAR ENERGY SYSTEM INSTALLATION
On this page, we will be following
the New Mexico Solar and Wind installation crew as they
install a 100 kW system at JJM Farms in Dexter, NM. This unique
installation will provide all the power required to operate a deep artesian
irrigation well and center pivot sprinkler.
 |
 |
|
JJM Farms - Menefee Farm Artesian
Well |
JJM Farms - Menefee Farm Center
Pivot Sprinkler |
.JPG) |
 |
|
JJM Farms - Menefee Farm Solar Energy
System Site from South |
JJM Farms - Menefee Farm Solar Energy
Site from North |

.JPG) |
|
.JPG) |
|
.JPG) |
|
GPS |
|
GPS Post Placement |
|
Array Post Locations Staked and Flagged |
.JPG) |
|
 |
|
 |
|
Post Driving Machine |
|
Raising Post into Position |
|
Lowering Hydraulic Hammer to Post |
 |
|
 |
|
 |
|
Aligning Post Vertically |
|
Driving Post 63" into ground |
|
Installed Post |
 |
|
 |
|
Array Posts Installed |
|
Array Posts Installed |
 |
|
Solar Power is coming to the Pecos Valley |
.jpg) |
|
.jpg)
|
|
Laying out Racking Materials |
|
Materials Ready for Mounting |
.jpg) |
|
.jpg) |
|
Posts and Binders Installed |
|
Posts and Binders Installed |
.jpg) |
|
.jpg) |
|
First Array Racking Installed |
|
View of Array Racking from South |
 |
|
 |
|
Installing Racking Rails |
|
Completed Sub-Array Racking |
 |
|
 |
|
Completed Sub-Array Racking |
|
Completed Sub-Array Racking |
 |
|
 |
|
Completed Sub-Array Racking |
|
Completed Sub-Array Racking |
 |
|
 |
|
Completed Sub-Array Racking |
|
Completed Sub-Array Racking |
 |
|
 |
|
Unloading modules for first array |
|
First array of modules installed |
 |
|
 |
|
Installing modules on Arrays 2 and 3 |
|
Check out our new "Parking Garage" |
 |
|
 |
|
Unpacking more modules |
|
Rain clouds threatening to stop work |
 |
|
 |
|
Rain less than a mile away; maybe we
should quit for the day..... |
|
The rain finally came......but at least
the arrays got a wash job! |
 |
|
 |
|
Installing the last modules on the last
subarray |
|
Waiting for the cement truck to come |
 |
|
 |
|
Inverter slab poured. |
|
The center pivot sprinkler passes by the
Solar Array that will power it. |
 |
|
Wide angle shot looking down 9 rows of
Subarrays totaling 550 Solar PV Modules |
 |
|
 |
|
Looking down the Alley |
|
15 Subarrays - 550 modules |
 |
|
JJM Farms Solar Installation from NM
Highway 2 |
 |
|
 |
|
Installing string wiring on Array |
|
Array 1 and 2 string wiring completed |
.jpg) |
|
.jpg) |
|
Module string wiring completed - back
view |
|
Module string wiring completed - front
view |
.jpg) |
|
.jpg) |
|
Conduit Trench - 500' North to South |
|
Conduit Trench - South from Inverter Pad |
.jpg) |
|
.jpg) |
|
Conduit Trench - North from Inverter Pad |
|
DC conduit in trench to Inverter |
.jpg) |
|
.jpg) |
|
Relocated Inverter pad |
|
Inverter Pad with AC conduit |
.jpg) |
|
.jpg) |
|
DC Wiring Conduits in trenches to Array 3 |
|
DC and AC Wiring Conduit in trenches |
ANOTHER INFINERGY SOLAR SYSTEM INSTALLATION
MAKING CLEAN, EFFICIENT, AFFORDABLE SOLAR POWER.
STAY TUNED FOR MORE SYSTEMS PHOTOS TO
COME.......
THANKS
Thanks and appreciation is given to Murray
Hambrick, Kimberly Davis and all the staff of Infinergy Wind and Solar for their
support and help, especially to Ralph Chambati for his patience and instruction,
to Wrangler Electric, Mike Brinkman and crew for a job well done, to Xcel
Energy, Steve Gonzales, Robert Perea and Jackie Webb for their help and
cooperation, to our major suppliers Aide Solar, Nextronex Energy Systems,
Schletter Solar Mounting Systems and Roswell Winlectric, and to John Berry and
JJM Farms for their patience and help.